With the Shandong water well drilling rig the popularity of its maintenance has become members are very concerned about the issue, along with small series to learn about it then:
1. the machine must be disassembled to clean all parts before they are used, to get rid of the machines in the factory coating antirust grease after cleaning fit all surface lubrication, use should be run under low pressure, or half-turned on for about 10 minutes in order to work.
2. the gas supply line pressure should be at least 0.5-0.6Mpa within, if pressure is too high easy-damaged parts, if the pressure is too low drilling efficiency decreased, resulting in rock drill not normal to use.
3. prior to the gas supply pipe and drill through to, first of all the dirt blowing pipe, so the dirt blown into the body which failure and damage parts of the valve. Water connected before you power on, check the screw joints are tightened, before the official start.
4. the machine is activated, first verify suitability of oil mist spray, adjust, work process, every 1 hour to fill the Lubricator with oil, not without lubrication.
5. the machine should be running start, air leg propulsion is increasing at the same time, to open rock at full speed. May not be in the air-leg lifts largest open when running, which may lead to machine jammed, could not open work at full speed for a long time, so as to avoid parts wear.
Shandong drill method above is to maintain hope small summary can help you.