Contact person: song Manager
Phone: 13583563503, 13561966637, 13455547961
Fixed: 0535-2318543
Fax: 0535-2318730
Address: Shahe town, laizhou city, Shandong province industrial park
Crawler drill Note:
1, feel free to check the water pipe, fitting bolts, nuts are are firm;
2, pay attention to check wind motor lubricant condition;
3, when the face when in the water, opening with the diameter of the bit, insert the drill pipe, drill pipe out of the water 1-2 meter to prevent mud and rock slag fell into the hole,
4, drilling operations off when refused to reverse this afternoon so as not to drill into the hole;
5, to stop work in a short time, to give a small amount of air to avoid sediment into drill hammer, if long time stop drilling, should upgrade the impactor 1-2 metres from the hole fixed;
Above is using crawler drilling machine, need to be aware of things, do you understand now? If you still have questions, please feel free to inquire.
All rights reserved: Shandong forest and heavy machinery, LtdMobile
Drilling machine manufacturers - downhole drilling rig manufacturer - crawler drilling machine - crawler water well drilling rig - crawler drilling machine - Shandong water well drilling rig - drilling machine in Shandong - deep water well drill - through a bad rig - crawler DTH drill rig