Welcome To - Shandong forest and heavy machinery, Ltd!
Shandong forest and heavy machinery, Ltd
Service Hotline:

0535-2318543  13455547961

Banner
You are here: Home > News > Content
Category

Contact person: song Manager

Phone: 13583563503, 13561966637, 13455547961

Fixed: 0535-2318543

Fax: 0535-2318730

Address: Shahe town, laizhou city, Shandong province industrial park

Run-in period is very important for crawler drilling rig
Edit:Shandong forest and heavy machinery, Ltd   PublicDate:2016-11-14

Crawler drill after the factory, has been provided for about 60 hours of break-in period (period), which is manufacturing plants according to the required technical features of the early use.

Break-in period is to ensure the crawler water well drilling rig working, lower failure rates, prolong the life of one of the important links. But so far, some users due to lack of use, or as tight, or as soon as possible to reap the benefits, while ignoring the special technical requirements of the new period. Some users even believe that manufacturers warranty period, machine is broken by the manufacturer is responsible for the maintenance and machine in overload for a long time used during the break-in period, lead to early failure of the machine are frequent, affecting not only the normal use of the machine and shorten the service life of the machine, but also because of engine damage, affecting the progress of the project.

Therefore, crawler drill a break-in period of use and maintenance should be paid enough attention.


All rights reserved: Shandong forest and heavy machinery, LtdMobile

Drilling machine manufacturers - downhole drilling rig manufacturer - crawler drilling machine - crawler water well drilling rig - crawler drilling machine - Shandong water well drilling rig - drilling machine in Shandong - deep water well drill - through a bad rig - crawler DTH drill rig