Welcome To - Shandong forest and heavy machinery, Ltd!
Shandong forest and heavy machinery, Ltd
Service Hotline:

0535-2318543  13455547961

Banner
You are here: Home > News > Content
Category

Contact person: song Manager

Phone: 13583563503, 13561966637, 13455547961

Fixed: 0535-2318543

Fax: 0535-2318730

Address: Shahe town, laizhou city, Shandong province industrial park

Take you about drill drill
Edit:Shandong forest and heavy machinery, Ltd   PublicDate:2016-09-05

Shandong drill of the drill-the drill needs to be replaced when all drill wells out, this is called drilling operations. Up drill of process including following operation: Shang mention drill with full dew party drill pipe, let drill column seat in turntable above; spin below drill pipe, will party drill pipe a taps placed big rat hole in the; upgrade drill column to 1 State root (General by 2?3 single composition) height, and will drill column seat in turntable Shang; with big silver and Cat Head (or pine buckle cylinder) pine buckle; Shang clamp card live joint, turntable are turned unloading buckle; moved State root people drill pipe disc and two layer Taiwan refers to beams, picked open hanging card; decentralization empty hanging card to wellhead. Stand up several times to repeat the process, completed per 1 root from a drilling operation cycle.
Now you know the meaning of Shandong water well drilling rig to drill here, if you have any questions, welcome to inquire.

All rights reserved: Shandong forest and heavy machinery, LtdMobile

Drilling machine manufacturers - downhole drilling rig manufacturer - crawler drilling machine - crawler water well drilling rig - crawler drilling machine - Shandong water well drilling rig - drilling machine in Shandong - deep water well drill - through a bad rig - crawler DTH drill rig