Welcome To - Shandong forest and heavy machinery, Ltd!
Shandong forest and heavy machinery, Ltd
Service Hotline:

0535-2318543  13455547961

Banner
You are here: Home > News > Content
Category

Contact person: song Manager

Phone: 13583563503, 13561966637, 13455547961

Fixed: 0535-2318543

Fax: 0535-2318730

Address: Shahe town, laizhou city, Shandong province industrial park

Discussion on use of crawler rigs of the time considerations
Edit:Shandong forest and heavy machinery, Ltd   PublicDate:2016-08-15



Crawler drill before use to pay attention to the following points:
1, drill duty stations should be kept clean.
2, when mounting and dismounting of the rig, accuracy and integrity of the machine.
3, drill rig mast lift when the operator should stand in a safe place.
4, start the motor, should open the rig all the friction clutch.
5, when the rig work, is strictly prohibited to remove the protective cover.
6, before work begins, you should first check the reliability of the brake and friction performance of the clutch and starter.
7, before the motor did not stop, disable checking drills.
8, drill work, fasten drill any parts is strictly prohibited.
9, when the drilling rig operation, refueling is strictly prohibited. the mast upper pulley refuelling should be carried out when the drill is stopped.
10, before the motor did not stop, do not allow work on the mast.

All rights reserved: Shandong forest and heavy machinery, LtdMobile

Drilling machine manufacturers - downhole drilling rig manufacturer - crawler drilling machine - crawler water well drilling rig - crawler drilling machine - Shandong water well drilling rig - drilling machine in Shandong - deep water well drill - through a bad rig - crawler DTH drill rig