Welcome To - Shandong forest and heavy machinery, Ltd!
Shandong forest and heavy machinery, Ltd
Service Hotline:

0535-2318543  13455547961

Banner
You are here: Home > News > Content
Category

Contact person: song Manager

Phone: 13583563503, 13561966637, 13455547961

Fixed: 0535-2318543

Fax: 0535-2318730

Address: Shahe town, laizhou city, Shandong province industrial park

Shandong water well drilling rig structure what are the
Edit:Shandong forest and heavy machinery, Ltd   PublicDate:2016-07-19

Shandong water well drilling rig consisting mainly of: diesel engine, clutch, transmission, transfer case, drive shaft, pump, water pump, vacuum pump, rotary table, faucet, winches, hydraulic system, control, mast, drill, frame, and so on.

Shandong wells rig of work principle: Shandong wells rig of work way is pump sucking anti-cycle type, its work principle is: in atmosphere pressure of constantly role Xia, cycle liquid by precipitation pool by back ditch Hou, along wells of ring clearance has been flow to bottom, at turntable drive drill pipe led bit rotating for drilling, by pump pumping sucking Hou established of negative pressure, put debris and mud inhalation to drill pipe within cavity, then rose to taps, by pump row into precipitation pool, precipitation Hou of cycle liquid continues to into well hole, so cycle, Forming a reverse circulation drilling work.

1, hydraulic pumps: twin, large displacement pump to power power head, small-displacement pumps are classified into four Outrigger cylinder, mast oil tank, Afterburner/lifting pulley power cylinder.

2, four legs: small drilling devices fixed by hydraulic cylinder and frame. Body level can be adjusted at the work site, and play a role in supporting and stabilizing the body.

3, mast: for giant steel tube, steel and angle steel welding frame, powered with recessed channel on both sides first to run up and down the track and ensure the drill vertical. Drilling mast landing was done by hydraulic cylinders.

4, power: used gear reducer body, its low speed shaft has a big hole in the middle of a mandrel, mandrel head can be connected the device of concrete and rubber tubes, filled with concrete; mandrel out through the flange connected drill pipes, drill bits. High-speed shaft driven by high torque hydraulic motors.


All rights reserved: Shandong forest and heavy machinery, LtdMobile

Drilling machine manufacturers - downhole drilling rig manufacturer - crawler drilling machine - crawler water well drilling rig - crawler drilling machine - Shandong water well drilling rig - drilling machine in Shandong - deep water well drill - through a bad rig - crawler DTH drill rig