Crawler drilling machine before the formal entry must be debugged, then what are the steps, take a look.
1, turn on all electrical power, temporary power, observe the motor turning.
2, through to drill pump to operate drilling rigs into the return lines between.
3, the installation of mechanical and Rotary crane.
4, the rig level, alignment.
5, installation support and lift rod.
6, water the anchor bolt hole.
7, connect cooling water system.
8, formed, able to pump slurry circulation system.
Above is the crawler drilling machine used to do before the commissioning work, I hope you can help.