Method of improving drilling efficiency in Shandong province
Edit:Shandong forest and heavy machinery, Ltd   PublicDate:2016-07-19

Drilling machine in Shandong province has important applications in engineering, in the course of operations, wants to improve the efficiency of drilling machine in Shandong province are many technicians want to, there are many, here is to introduce methods for improving the efficiency of drilling machine in Shandong province.

Shandong before drilling machine job, you must check all parts, water from drainage holes into the pipe. and commissioning bodies, recognized correctly, can work.

Piling site requirements flat, and solid, and no dust, and no high-tension line, and no obstacles real, the well should not be playing too deep, General 8-12m compared suitable. underground no holes, and no laid real, rain Hou no water, dang moving level from ground SM above, don't selection the well type, and should set security works, and ban pedestrian into or stay. sleepers should laying in solid flat of ground Shang, track grounding resistance not is greater than 10 ω, rail distance deviation shall not over ± 0.6cm, track joint Board connection must firm.

Shandong operation of the drilling was to have a strictly defined, such as Shandong drilling machine is the most basic requirement is that the operator must be licensed, so drilling large grain of salt before adding flower tube, comply with the safety rules and safety in ten disciplines. the water hole is not blocked, as well salt dissolves slowly,

Power wire, and motor and knife wiring right, insulation good, voltage deviation shall not over ± 5%, small tube of construction, General used small rig playing hole to must depth Hou, will processing good of wall tube Xia to well within. If two Taiwan motor must while operation Shi, should across must time started. Board State pile frame Shi, dang Board Super 10~20cm Shi, should downtime check, the parts normal rear can continues to rose.

Above is the introduction of the method for improving drilling efficiency in Shandong province, I believe that through the above explanation, many methods of raising drilling machine in Shandong have more understanding, I believe many people will be able to benefit.


All rights reserved: Shandong forest and heavy machinery, LtdMobile

Drilling machine manufacturers - downhole drilling rig manufacturer - crawler drilling machine - crawler water well drilling rig - crawler drilling machine - Shandong water well drilling rig - drilling machine in Shandong - deep water well drill - through a bad rig - crawler DTH drill rig